Home
> Business Scope > Features
Protect eyesight:
Qinghai-Tibet AC/DC Grid Interconnection Project
Date:2019-03-21 VisitCount: Font size:[ L M S ]
 
The most challenging transmission and transformation project so far in the World,with the highest in elevation and the largest construction in alpine region.The lack of oxygen,geological complexity and large-scale frozen soil made the project extremely difficult technically
print】【close
Prev:
Next:

   
Produced By 大汉网络 大汉版通发布系统