Home
> News > Company News
Protect eyesight:
The First Unit of Ethiopia GD-3 Hydroelectric Power Project Undertaken by Energy China CGGC Connected to the Grid
Source:CEEC Date:2020-02-27 VisitCount: Font size:[ L M S ]
The first unit of Ethiopia GD-3 Hydroelectric Power Project untaken by CGGC, which is a subsidiary of Energy China, has connected to the grid on 4th February 2020. The Ethiopian Prime minister Abiy Ahmed Ali attended the ceremony and pressed the generation button.


Abiy Ahmed Ali visited the principle part of the dam, the underground powerhouse and other works. He approved the engineering construction quality of GD-3 and highly complimented the environmental protection measures adopted by the contractor. He also states that the formal generation of GD-3 Hydroelectric project will make a great contribution to the economic development of Ethiopia.


It is known that GD-3 Hydroelectric project is located in the southern part of Addis Abba, the capital city of Ethiopia. The water level of the reservoir reaches 1120 meters and the capacity is 254MW. The grid-connected generation of the hydroelectric project will greatly alleviates the shortage of power supply and consumption in Ethiopia.

print】【close
Prev:
Next:

   
Produced By 大汉网络 大汉版通发布系统