Home
>News>Top News
The Lhasa-Nyingchi Railway was Officially Put Into Operation
The Lhasa-Nyingchi Railway was officially put into operation on June 25. China Gezhouba Group (CGGC), a subsidiary of Energy China, participated in the construction. The train departs from Lhasa Station and can reach Linzhi in 3 hours and 29 minutes now.The Railway has a total length of 435.48 km, with a design speed of 160 km/h. CGGC undertook the construction of the 7th section. The total length of the section is 26.7 km. It includes the construction of the subgrade and its supporting project, station, bridge, culvert, tunnel, etc.
Produced By 大汉网络 大汉版通发布系统